Dynamic Loading Test
 
Purpose: As moving equiment will generate extermely large dynamic loading, the test is to prove that VERO's raised floor is capale for dynamic loading when the tooling is move-in. 
Location: Vero Shanghai Raised Floor Labortory
Condition: Tooling with 6.5 tons is move around on the VERO's raised floor
Result:

No destruction in the structure is Shown after seismic test。